Wembley Stadium


project-wembley Client: Wembley Stadium
Contractor: Multiplex
Package Value: £15,000,000
Architect: World Stadium Team
Structural Engineer: Connell Mott MacDonald
Duration: 2 years
Year: 2006


Description


Construction of the New National Wembley Stadium for Multiplex Construction UK. The project included laying 1.8m blocks internally along with the split faced blockwork to the external perimeter walling.

Pyramid Builders Ltd provided a fully integrated package that also included all engineering, steel windposts and firestopping, along with the logistical management of all associated vehicles.

This is the largest blockwork package placed in the UK to date.

Back to projects