London Aquatics Centre


Aquatics Header Client: Olympic Delivery Authority
Contractor: Balfour Beatty
Package Value: £1,800,000
Architect: S&P Architects
Structural Engineer: Arups
Duration: 1 year
Year: 2011


Description


Pyramid Builders Ltd were contracted to construct the internal blockwork walls on this iconic venue for the London Olympics. Pyramid Builders Ltd were able to offer a composite package of blocklaying, scaffold access and management which produced a highly commended blockwork solution.

Pyramid Builders Ltd developed the wall design by utilising the WI Beam and WI Column systems, designed by our sister company Wembley Innovation, to achieve the required loadings with minimal disruption to the aesthetics of the internal finishes. We were able to omit the requirement for the use of Windposts and concrete lintels on the entire scheme. This was a major benefit bearing in mind the effect too many movement joints would have on tiling and connections.  In addition, it allowed the M&E design optimum flexibility in the positioning of services.

During the period on site, Pyramid Builders Ltd were also awarded the insulation package which involved supplying and installing Foamglas structural insulation.

Back to projects
Pyramid Builders Ltd, 38a Fourth Way, Wembley, HA9 0LH - Telephone: 0208 795 3371 Email: office@pyramidbuildersltd.co.uk
Copyright © 2018 Pyramid Builders Ltd. All Rights Reserved.